RUS | ENG
Joint Institute for Nuclear Research
01.09.2023

Composite mirror for the TAIGA project

A new technology of creating lightweight composite mirrors for TAIGA Cherenkov telescopes was proposed and the prototype of such a mirror was manufactured in Sector 4 of Astrophysical Research of the DLNP Department of Particle Physics together with the Center for Digital Manufacturing of the Dubna State University.

The TAIGA project is implemented at the Tunka Astrophysical Complex, located 50 km from Lake Baikal. Studies of ultra-high-energy cosmic rays by detecting extensive air showers (EAS) have been conducted here since 1993. 

Currently, the preparation for the further upgrade of the detectors is under way as well as their expansion to an area of approximately 10 km². The project will introduce telescopes with segmented mirrors about 6 m in diameter, which will require creating lightweight composite mirrors. Their production will enable a transition from the traditional process of making solid glass mirrors to faster and more efficient production of a larger number of mirrors for Cherenkov telescopes. The parameters of the mirror are currently being measured, the technology is being refined, and a proposal is being prepared for the TAIGA collaboration to organize the production of a batch of mirrors.

Finished part in a vacuum bag
Master mold to shape the mirror to the desired radius of curvature
Composite mirror. Front view
Composite mirror. Back view
Workstation for manufacturing composite parts using vacuum infusion
Completed mirror prototype